Service
Plant throughput
The bottleneck is rarely where the meeting says it is
+18%
output from the same equipment, no capital spend
We stand on the line for two weeks with a stopwatch and a notebook before recommending anything. The answer is usually changeover time, not machine speed.
What the engagement includes
Time study on every station across all shifts · Changeover analysis with the operators who do it · A sequence of changes ordered by payback, not by cost · Standard work written down in the language of the floor
