Work
Engagements, with the numbers the client signed off.
Clients are named only with written permission, so most are described by sector and city. Every figure was checked in their accounts, not ours.
Automotive supplier, Ostrava
Late deliveries were a contract problem, not a shipping problem
94%
on-time deliveries, up from 71% in nine months
Building products distributor, Rotterdam
Half the stock was the wrong stock
-24%
working capital in stock, twelve months on
Food and beverage manufacturer, Chicago
The bottleneck was the changeover, not the line
+18%
output from the same equipment, no capital spend
